MILENA: IZMIR – KOBE

Varamar performed the shipment of dismantled factory for MITSUBISHI HITACHI POWER SYSTEMS. Project cargo (ducting parts in 22 packages; gross weight: 121.573,00 kg) was loaded in Turkey and safely discharged in Japan.

back
Developed by GEOMETRIC
Copyright © 2009-2017 Varamar